Construction Packages
Bespoke turnkey packages for independent residential construction in Bangalore. No hidden fees.
Compare Our Pricing Packages
We offer three curated specifications that combine civil quality, branded fixtures, and finish details. Find the right package for your lifestyle and budget.
Essential
Value-oriented pricing covering vital structural specifications and standard fittings.
- ✓ Cement: Birla Shakthi / Zuari
- ✓ Steel: Kamadhenu / Meenakshi
- ✓ Windows: UPVC Windows
- ✓ Flooring: Flooring Tiles
- ✓ Main Door: Teak Main Door
- ✓ Protection: Waterproofing Included
- ✓ Systems: Electrical Wiring & Plumbing
Standard
Upgraded finishes, premium doors, and elevated material brands for beautiful durability.
- ✓ Cement: RAMCO / ACC
- ✓ Steel: Prime Gold / Sunvik TMT
- ✓ Flooring: Better flooring options
- ✓ Doors: Premium doors
- ✓ Protection: Waterproofing Included
- ✓ Systems: Electrical & Plumbing Upgrades
- ✓ Fixtures: High-end fixture selections
Premium
Top-tier specification incorporating luxury structural materials, custom options, and finish details.
- ✓ Cement: Ultratech / Birla Super
- ✓ Steel: SK TMT / INDUS
- ✓ Flooring: Premium flooring options
- ✓ Finishes: Better finishing materials
- ✓ Protection: Waterproofing Included
- ✓ Systems: Advanced Plumbing & Electrical
- ✓ Fixtures: Bespoke luxury fittings
Interactive Budget Estimator
Select your preferred package and input the built-up area of your plot to estimate your construction cost instantly.
Calculation Parameters
Detailed Material Specs
Compare architectural details, structural brands, finishing standards, and warranty policies across our three curated packages to find the perfect fit for your home.
| Specification |
Essential
₹2,200/SFT
|
Standard
₹2,300/SFT
POPULAR
|
Premium
₹2,500/SFT
|
|---|---|---|---|
| Structure | |||
| Cement | Birla Shakthi, Zuari | RAMCO, ACC | Ultratech, Birla Super |
| Steel (TMT) | Kamadhenu, Meenakshi | Prime Gold, Sunvik TMT | SK TMT, INDUS |
| Wall Blocks | 6" & 4" Blocks (All Packages) | 6" & 4" Blocks (All Packages) | 6" & 4" Blocks (All Packages) |
| Sand | M Sand (All Packages) | M Sand (All Packages) | M Sand (All Packages) |
| Plastering Sand | P Sand (All Packages) | P Sand (All Packages) | P Sand (All Packages) |
| Aggregate | 40mm / 12.5mm (All Packages) | 40mm / 12.5mm (All Packages) | 40mm / 12.5mm (All Packages) |
| Doors | |||
| Main Door | Teak Frame 5"x4", 32mm Shutter – ₹30,000 | Teak Frame 5"x4", 32mm Shutter – ₹45,000 | Teak Frame 5"x4", 32mm Shutter – ₹60,000 |
| Pooja Door | Allowance: ₹18,000 | Allowance: ₹22,000 | Allowance: ₹25,000 |
| Bedroom Doors | Saal Frame + Skin Door – ₹8,500 | Allowance: ₹9,000 | Allowance: ₹11,000 |
| Toilet Doors | WPC – ₹8,000 | Allowance: ₹10,000 | Allowance: ₹12,000 |
| Windows & Grills | |||
| Windows | UPVC 2.5 Track, 5mm Glass – ₹550/SFT | UPVC 2.5 Track, 5mm Glass – ₹550/SFT | UPVC 2.5 Track, 5mm Glass – ₹550/SFT |
| Window Grill | Allowance: ₹160/SFT | Allowance: ₹160/SFT | Allowance: ₹180/SFT |
| Flooring & Tiling | |||
| Main Flooring | Tiles – ₹60/SFT | Tiles / Granite – ₹80/SFT | Tiles / Granite – ₹100/SFT |
| Bathroom Dado | Allowance: ₹40/SFT | Allowance: ₹50/SFT | Allowance: ₹55/SFT |
| Kitchen Dado | Allowance: ₹40/SFT | Allowance: ₹45/SFT | Allowance: ₹55/SFT |
| Balcony/Parking | Allowance: ₹40/SFT | Allowance: ₹50/SFT | Allowance: ₹55/SFT |
| Staircase Granite | Sadaralli – ₹80/SFT | Sadaralli / Steel Grey – ₹90/SFT | Other Granite – ₹100/SFT |
| Staircase Railing | MS Railing – ₹1,000/RFT | SS Railing – ₹1,100/RFT | SS Railing – ₹1,200/RFT |
| Paint & Finishes | |||
| Internal Paint | Tractor Emulsion | Tractor Emulsion | Premium Emulsion |
| External Paint | Asian Ace | Asian Apex | Asian Apex Ultima |
| Kitchen | |||
| Kitchen Slab | Granite – ₹130/SFT | Granite – ₹140/SFT | Granite – ₹160/SFT |
| Kitchen Basin | Allowance: ₹6,000 | Allowance: ₹8,000 | Allowance: ₹9,000 |
| Plumbing & Waterproofing | |||
| Plumbing Pipes | Astral | Astral / Ashirvad / Supreme | Astral / Ashirvad / Supreme |
| Overhead Tank | Kaveri Double Layer | Triple Layer | Triple Layer |
| Underground Sump | 8,000 Litres | 10,000 Litres | 10,000 Litres |
| Bathroom Accessories | Allowance: ₹20,000 | Allowance: ₹25,000 | Allowance: ₹30,000 |
| Waterproofing | Dr. Fixit | Dr. Fixit | Fosroc Brush Bond |
| Electrical | |||
| Wiring | Finolex / Anchor Fireproof | Finolex / Anchor Fireproof | Finolex / Anchor Fireproof |
| Switches | Anchor Roma | Anchor Roma | Legrand |
| Construction Standards | |||
| Floor-to-Floor Height | 10'6" (All Packages) | 10'6" (All Packages) | 10'6" (All Packages) |
| Plinth Height | Car Park: 1.5 ft | Building: 2 ft | Car Park: 1.5 ft | Building: 2 ft | Car Park: 1.5 ft | Building: 2 ft |
| Warranty | 15 Years Structural Warranty | 15 Years Structural Warranty | 15 Years Structural Warranty |
Exclusions & Payment Structure
To ensure absolute transparency throughout the construction process, please review the standard package exclusions and site requirements below.
✕ Project Exclusions
Lift machinery, shaft fabrication, and installation are excluded from the package.
BESCOM permanent and temporary electrical line linkages.
Municipal corporation building plan approval charges and fees.
Borewell drilling, casing pipe, and pump installations are not included in the package.
Complete woodwork, wardrobes, and kitchen cabinet interiors are not included in the package.
Compound wall and gate are excluded from the package.
Custom designer front elevations, texture paint, or special cladding.
Any work not explicitly mentioned within this package or located outside the site boundary shall be charged for accordingly.
Any road cutting charges for the connection of Electricity and Sewage lines is not included, such works shall be charged additionally.
A customized payment schedule will be shared based on the project specifications.
✓ Site Conditions & Utilities
Client must provide Temporary power for the construction. Temporary power renewal should be done by Client every month until the Construction of project is completed.
Water for Construction of the project: Required amount of Water for construction of the project should be provided by the Client.
SBC of soil is considered at 180 KN/M² and depth of the foundation considered at 5 Feet, any increase in depth shall be charged accordingly on actuals upon site conditions.
Buying new earth/sending existing earth for excavation/backfilling purpose shall be charged on actual.
Breaking/drilling Rock: Rock breaking or drilling expenses will borne by Client.
Ready to Receive Your Customized Construction Estimate?
Schedule a direct site visit in Bangalore to receive an accurate, transparent Bill of Quantities tailored to your exact plot and layout.